Automation projects fail in a predictable way. Somebody picks the most complicated process in the organisation, because it is the one that annoys people most, and six months later it half works and nobody trusts it.
The right first automation is dull. It repeats, its rules are clear, and if it goes wrong somebody notices the same day.
The test, before you choose anything
Four questions. A task worth automating first answers yes to all four.
- Does it repeat? The same steps, in the same order, at a predictable moment.
- Can you write down the rules? Including the awkward cases. If the answer to a case is “it depends who is asking”, it is not ready.
- Is it typing rather than deciding? Moving information between two systems is ideal. Judging whether something is acceptable is not.
- Would a mistake be visible? Quick and obvious failure is much safer than a quiet error discovered a year later.
Now three tasks that usually pass.
One: getting a new starter set up
Almost every organisation does this by hand and does it slightly differently each time. Accounts, licences, group memberships, an entry in the directory, a device assigned, a welcome message.
It repeats, the rules are clear once roles are written down, it is entirely typing, and a mistake is visible on the first morning.
Start with the accounts and the group memberships. Leave the device and anything needing a physical action out of the first version. Even a partial automation removes most of the errors, because the errors are almost always a forgotten group rather than a forgotten account.
The version that removes access when somebody leaves matters more and is usually built second. It is worth building.

Two: moving information between two systems
Somebody copies details from a form into a finance system. Or from an email into a spreadsheet. Or from one system into another because the two do not speak to each other.
This is the purest case. There is no judgement, the rules are a mapping between fields, and an error is visible because the number is wrong in an obvious place.
Find it by asking people what they do that feels like retyping. Everyone can name theirs immediately, and the answer is rarely the process anybody would have guessed.
Three: the approval that is really a notification
A great many approvals are not decisions. They are somebody being told that something happened, with a formal step attached so there is a record.
These automate well. The request is captured in one place, the right person is notified, their answer is recorded with a timestamp, and the next step happens without anybody chasing.
The gain is usually not the clicks saved. It is that the request stops sitting in somebody’s inbox for four days, and that there is a record of who approved what.
Be careful to separate the true decisions. An approval where the answer is sometimes no, for reasons that need explaining, should keep a person firmly in the middle of it.
What to do before building anything
Watch the task being done once, by the person who does it. Not a description of it, the task itself. The description always leaves out the exception that happens twice a month, and the exception is what breaks the automation.
Then write the rules down and give them back to that person to correct. They will correct them.
Build the failure case first
Decide what happens when the automation cannot complete. Who is told, how they are told, and what state things are left in.
An automation that fails loudly is a small problem. One that fails silently is worse than not having it, because people have stopped checking. This is the single most common reason a working automation stops being trusted.
Measure the before, not just the after
Before building, note how long the task takes and how often it is done. Without that, you will never be able to say whether it was worth it, and the next proposal will be harder to get approved.
We start most automation work with exactly this conversation. There is more on our automation page, with related detail on Microsoft 365 and modern workplace. If there is a task in your organisation everybody complains about, describe it to us and we will say whether it passes the four questions.